RX
RECHIN X
ENERGY MANAGEMENT PLATFORM
SECURE CLIENT PORTAL
USERNAME
PASSWORD
Powered by Rechin Group · Secured · DEMO v3.0
demo
Staff view
manager
Site manager
admin
Rechin ops
evdemo
EV staff view
evmanager
Fleet manager
password
rechin2026
AI DISPATCH PLANNER
LOADING
Analysing live site data...
SOLAR NOW
-- kW
All sites
DIESEL SAVED TODAY
0 L
$0
AVG BATTERY
--%
Fleet SOC
ACCU YTD
0 t
TOTAL SAVINGS
$0
Since deployment
ACTIVE SITES
Kalgoorlie Mine
RM-2000 · WA
BATTERY SOC
88%
SOLAR342 kW
BESS180 kW
SAVED$0
Wimmera Farm
RM-500 · VIC
BATTERY SOC
45%
SOLAR68 kW
BESS42 kW
SAVED$0
Kalgoorlie Light Fleet
RC-500 · WA
BATTERY SOC
62%
SOLAR95 kW
EV12 active
ALERTCELL TEMP
Kalgoorlie Mine -- Energy Flow
AUTO
☀️
SOLAR
342 kW
charging
🔋
BATTERY
88%
🏭
SITE LOAD
522 kW
DIESEL
STANDBY
Solar65%
Battery35%
Diesel0%
LIVE POWER WAVEFORM
Site Map
AUSTRALIA
KALGOORLIE PERTH WIMMERA
Cumulative Savings
$1,074,420
AUD ALL SITES
Diesel at $3.05/L · Live
Live Activity
5 events
Kalgoorlie · RM-2000
Wimmera · RM-500
Perth · RC-500
2MWh 256 cells 8 racks
BATTERY CELL HEALTH -- KALGOORLIE MINE
Cell Temperature Heatmap
97.4% HEALTHY
25C OK 35C WARN 38C ALERT Click any cell
CELL B3-10
CRITICAL
close
TEMP
38.1C
VOLTAGE
3.29V
CAPACITY
98.2%
CYCLES
284
AI SYSTEM STATUS & ACTION LOG
Loading...
Module Health
TOTAL
256
HEALTHY
249
WARNING
6
CRITICAL
1
AVG TEMP
29.4C
MAX TEMP
38.1C
HEALTH
97.4%
LIFESPAN
9.2 yrs
CELL ADDRESS FORMAT
B2-07 = Rack B, Module 2, Cell 7. Each row = one module. Each column = one cell. Click any cell to inspect.
SITE PERFORMANCE
Kalgoorlie
RM-2000
Battery SOC88%
Solar utilisation94%
Diesel displacement97%
Wimmera
RM-500
Battery SOC45%
Solar utilisation88%
Diesel displacement73%
Kalgoorlie Light Fleet
RC-500 ALERT
Battery SOC62%
Solar utilisation100%
EV sessions12
Module B3 temp alert
Day-Ahead Dispatch Schedule
AI OPTIMISED
KALGOORLIE WA
☀️
--°C
-- solar eff
-- sun today
WIMMERA VIC
--°C
-- solar eff
-- sun today
KALGOORLIE WA (FLEET)
☀️
--°C
-- solar eff
-- sun today
00:0002:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:0024:00
Kalgoorlie
Diesel
Solar charging
BESS dispatch
Backup
Wimmera
Diesel
Solar
BESS
Backup
Kalgoorlie Light Fleet
Pre-charge
Solar EV charge
Peak EV
Top-up
KALGOORLIE TOMORROW
$2,880
976L diesel avoided
WIMMERA TOMORROW
$840
285L diesel avoided
PERTH DEPOT TOMORROW
$560
Grid electricity avoided
Cumulative Savings
ROI
Monthly Diesel Saved (L)
2025-2026
Kalgoorlie Payback
34%
$612K of est. $1.7M recovered
ACCU Summary
CO2 AVOIDED
87.3 t
VALUE
$3,056
TARGET
243 t
ON TRACK
YES
10-Year Projection
TOTAL SAVINGS
$21.4M
ACCU REVENUE
$85K
INVESTMENT
$3.33M
ROI
6.4x
RECHIN MINE
RECHIN CHARGE
How Much Could You Save?
Enter your monthly diesel bill and we do the rest.
STEP 1 — HOW MUCH DIESEL DO YOU BUY?
In Litres
In Dollars (AUD)
Litres / month
From your fuel delivery invoice — 3-month average is best
STEP 2 — WHERE IS YOUR SITE?
WA Goldfields
WA Pilbara
NT
QLD / NSW
VIC / SA
Other
ADVANCED SETTINGS
(optional — we use best estimates by default)
YOUR ESTIMATED MONTHLY SAVING
$193,000
every single month, straight off your operating costs
ANNUAL SAVING
$2.31M
PAYBACK PERIOD
9.4 months
10-YEAR BENEFIT
$21.3M
RECOMMENDED SYSTEM
RM-2000
2MWh battery + 500kWp solar panels
INDICATIVE COST
$1.8M
97% of your diesel eliminated
HOW WE CALCULATED THIS
PLUS: GOVERNMENT CARBON CREDITS (ACCU)
Reducing your diesel use earns Australian Carbon Credit Units registered in your name. Estimated additional income: $3,000/month.
These are estimates based on your diesel consumption and current WA prices.
A Rechin engineer will verify exact figures during your site assessment.
Rechin X — Energy Management Platform
SITE MANAGER VIEW
Kalgoorlie Gold Mine — RM-2000 — Full operational control
DIESEL SAVED TODAY
0 L
$0 saved
BATTERY SOC
92%
1,760 kWh stored
SOLAR NOW
342 kW
Site load covered
ACTIVE ALERTS
1
Requires attention
Active Alerts
1 OPEN
⚠ CELL TEMP WARNING
Since 02:14 today
Module B3, Cell 10 running at 38.1C. Charge rate auto-reduced to 0.8C. System is managing it but on-site inspection recommended within 7 days.
No other alerts. System performing within normal parameters.
Today vs Last Week
COMPARISON
DIESEL SAVED
$0
vs $5,840 last week
SOLAR GEN
0 kWh
vs 3,240 kWh last week
DIESEL RUNS
0
vs 0 last week
Savings History
7D
30D
90D
System Status
OPERATIONAL
BESS statusWell Charged — 88% SOC
Solar invertersAll 4 online
Diesel generatorStandby — last run 2 days ago
Module B3 Cell 1038.1C — monitoring
Rechin X connectionLive — 4ms latency
Next O&M visit18 Apr 2026 — confirmed
Carbon Credits (ACCU)
YOUR CREDITS
87.3t
CO2 AVOIDED YTD
approx $3,056
Annual target 243t36%
Registered in your name by Rechin X. Credits issued each quarter.
This Month
DIESEL SAVED
18,420 L
COST SAVED
$54,340
PAYBACK TO DATE
34%
Reports & Analytics
Cumulative Savings
8 MONTHS
Monthly Diesel Saved (L)
TREND
Cost Comparison
Without Rechin vs actual cost this month
WITHOUT RECHIN
$73,400
YOUR ACTUAL COST
$2,205
$71,195 saved
ACCU Summary
CO2 avoided YTD87.3t
Credit value$3,056
Annual target243t
Safeguard compliantYES
Payback Progress
34%
$612K of $1.7M recovered
Full payback approx 8 months
Site Settings
Dispatch Mode
ACTIVE
AUTO
Rechin X decides
MANUAL
You set schedule
AUTO mode recommended. Rechin X optimises dispatch based on solar forecast, battery SOC and diesel price. Saves an estimated 8-12% more than manual scheduling.
Alert Thresholds
BATTERY LOW ALERT (notify me when below)
30%
CELL TEMP ALERT (flag above)
38C
Notification Preferences
Cell temperature alerts
Battery low warnings
Diesel generator starts
Monthly report ready
ACCU credit issued
O&M visit reminder
Your Account
SiteKalgoorlie Gold Mine
SystemRM-2000 — 2MWh
Access levelSite Manager
Support1800 RECHIN
DEMO SITE:
⛏ Mine Site Fleet
Kalgoorlie Gold Mine
🏠 Council Fleet
City of Perth Council
📦 Logistics Depot
Australia Post Perth
RC-500 natural upsell from RM-2000
PHASE 2 EXPANSION — SAME SITE, NEW LAYER
RM-2000 energy infrastructure already installed at Kalgoorlie. RC-500 adds light vehicle charging to the same BESS + solar system — no new infrastructure cost. 28 site vehicles now charge on solar energy they were already generating.
6:00 AM SHIFT READINESS
ALL 28 VEHICLES READY BY 05:47
1 hr 13 min buffer before shift start — Rechin X smart schedule running
CHARGING NOW
12
FULLY READY
8 / 20
CHARGERS ONLINE
28/28
SOLAR NOW
95 kW
Weather — Kalgoorlie Light Fleet
BOM LIVE
☀️
28°C
Clear sky — 12km/h wind
SOLAR TODAY
--%
efficiency
Solar Charging Forecast
PLANNING
Loading solar forecast...
Best solar window today10:00am — 3:00pm
Recommended pre-chargeTonight 10pm — 2am
Live Charger Status
12 active
8 free
Fast charging Slow charge Free Near full
Live Power Flow
SOLAR FIRST
☀️
SOLAR
95 kW
direct
🔋
BATTERY
78%
buffering
🔌
CHARGERS
150 kW
GRID
STANDBY
Solar share63%
Battery share37%
Grid draw0%
Charging Load Today
24 HOURS
Midnight6amNoon6pmMidnight
■ EV charging load ■ Solar generation
Battery Storage
CHARGED
78%
STATE OF CHARGE
Battery absorbing solar now. Will buffer evening peak charge window.
Energy stored390 kWh
Peak buffer capacity500 kWh total
Grid needed today0 kWh
Cost Saved Today
LIVE
ELECTRICITY COST ELIMINATED
$0
vs paying $0.32/kWh grid rate
kWh FROM SOLAR
0
SESSIONS TODAY
0
COST PER SESSION
$0
vs GRID COST
$0
Market Reality
LIVE TODAY
THIS IS HAPPENING RIGHT NOW
Mining sites are already deploying on-site energy systems across WA. Fortescue, Gold Fields and Northern Star all running light vehicle electrification programs.
WA mining sector: 200+ sites with 500+ light vehicles each. Zero grid access. All running diesel.
Fleet Readiness
6AM SHIFT
Smart charge schedule is running. All 28 vehicles projected to reach 90%+ SOC before 6am shift start.
100% ready (100%+ SOC)8 vehicles
Charging (50-99%)12 vehicles
Low priority (<50%)0 vehicles
Projected all-fleet 100% by 04:30 — 1.5 hrs before shift
Charging Sessions
Today's Sessions
0 sessions
CHARGER VEHICLE kWh COST SAVED STATUS
Monthly Summary
SESSIONS MTH
342
kWh DELIVERED
38,420
COST SAVED
$12,294
GRID AVOIDED
94%
AVG kWh/SESSION
112
PEAK DEMAND
180 kW
Cost Per Vehicle This Month
FOR YOUR BOSS
VEHICLE SESSIONS kWh IF GRID ACTUAL SAVED
Actual cost = 6% of grid rate (solar + BESS covers 94% of charging energy). Download full report via Reports tab.
Smart Schedule
AI OPTIMISED
Rechin X automatically schedules charging to maximise solar and off-peak periods. Vehicles that need less charge are queued for daytime solar windows. High-priority vehicles charge first regardless of time.

Tonight: 16 vehicles still charging. Solar pre-charge window 9am-2pm tomorrow will complete overnight batch. INS and UTE fleet prioritised for early shift.

Zero grid draw projected for next 18 hours.
Your Savings
Total Electricity Cost Eliminated
SINCE DEPLOYMENT
$38,420
AUD SAVED IN GRID ELECTRICITY COSTS
Grid electricity at $0.32/kWh peak · Deployment began August 2025
kWh FROM SOLAR
120,063
CO2 AVOIDED
98.5t
SESSIONS COMPLETED
2,736
Monthly Savings
Payback Progress
RC-500 indicative cost AUD $650K - $850K
31%
$294,500 of est. $750,000 recovered
Full payback in approx 14 months